The approved snapshot of scope, schedule, and cost against which changes and performance are measured. Changing the baseline requires formal control.
« Back to Glossary Index
« Back to Glossary Index
The approved snapshot of scope, schedule, and cost against which changes and performance are measured. Changing the baseline requires formal control.
« Back to Glossary Index